DED    = Detail Engineering Design
STO    = Site Take Over
PHO   = Provisional Hand Over
FHO   = Final Hand Over
COW  = Commencement of Work (Control of Work)
MC0  = Mutual Check 0
VO    = Variation Order
CCO   = Contract Change Order
PAM = Pre Award Meeting
PCM  = Pre Constructions Meeting = rapat persiapan pelaksanaan kontrak
Shop Drawing      = Gambar Kerja
As Built Drawing = Gambar Terlaksana