DED = Detail Engineering Design
STO = Site Take Over
PHO = Provisional Hand Over
FHO = Final Hand Over
COW = Commencement of Work (Control of Work)
MC0 = Mutual Check 0
VO = Variation Order
CCO = Contract Change Order
PAM = Pre Award Meeting
PCM = Pre Constructions Meeting = rapat persiapan pelaksanaan kontrak
Shop Drawing = Gambar Kerja
As Built Drawing = Gambar Terlaksana